File #: 22-5118    Version: 1 Name: Resolution - A Resolution Authorizing a Change Order and Providing Additional Funds for Holland Road Phase 2 Improvements (Stonebriar Trail to Garden Path Lane) with Ed Bell Construction Company for an Amount Not to Exceed $657,800.16. (Utility Fund)
Type: Resolution Status: Passed
File created: 12/29/2022 In control: City Council
On agenda: 1/9/2023 Final action: 1/9/2023
Title: Resolution - A Resolution Authorizing a Change Order and Providing Additional Funds for Holland Road Phase 2 Improvements (Stonebriar Trail to Garden Path Lane) with Ed Bell Construction Company for an Amount Not to Exceed $657,800.16 (Utility Fund)
Sponsors: Raymond Coffman
Attachments: 1. Resolution, 2. Map, 3. Proposed Value Engineering Options
Title
Resolution - A Resolution Authorizing a Change Order and Providing Additional Funds for Holland Road Phase 2 Improvements (Stonebriar Trail to Garden Path Lane) with Ed Bell Construction Company for an Amount Not to Exceed $657,800.16 (Utility Fund)


Requested Action
Consider the Resolution authorizing a Change Order to the contract of Ed Bell Construction Company for Holland Road Phase 2 Improvements (Stonebriar Trail to Garden Path Lane).

Recommendation
The Engineering Staff recommends approval of the Resolution.


Description/History
The Holland Road Phase 2 Improvements project was awarded to Ed Bell Construction Company on December 13, 2021 for an amount not to exceed $13,956,277.11. To mitigate potential pavement failure due to the significant sanitary sewer depth, an alternative was provided for the sanitary sewer trench backfill. This alternative included flowable fill to within ten feet to the top of pavement for a cost of $1,724,250.00. Based on the high cost of this alternative, Staff recommended award of the base bid without this alternative. At the time of award it was stated that a lower cost option would be investigated as a change order.

After the project started, alternatives to the flowable fill were proposed by Ed Bell to provide a better trench backfill option than native material while still being a lesser cost than the as-bid flowable fill alternative. The proposed option is to replace the flowable fill above the pipe embedment zone with material meeting the TxDOT specification of Type A Grade 1 Flexible Base. The proposed cost for this change is $657,800.16.


Justification
The Engineering Design Consultant and city staff agree that the proposed option of flexible base material above the pipe embedment zone can provide a much more stable trench backfill than the native material. It is understood that the contractor will have methods in place to achieve appropriate compaction with the material especially given the pos...

Click here for full text