Legislation Details

File #: 24-5835    Version: 1 Name: Consideration of Revised City of Mansfield Standard Construction Details, January 2024
Type: Consideration Item Status: Passed
File created: 1/17/2024 In control: Planning and Zoning Commission
On agenda: 1/23/2024 Final action: 1/23/2024
Title: Consider Proposed Revisions to the City of Mansfield Standard Construction Details (January 2024)
Attachments: 1. Standard Construction Details, January 2024

Title

Consider Proposed Revisions to the City of Mansfield Standard Construction Details (January 2024)

 

Description/History

Revised Standard Construction Details are being presented which represent changes that are being proposed to the city’s public infrastructure construction requirements.  These changes consist of the addition of asphalt pavement cross-sections (Sheets P-1 through P-3).  These street cross-sections are being added after much discussion with the City Council and the Subcommittee on Local Transportation Issues concerning the primary benefits of shorter pavement maintenance and rehabilitation timelines.  Significant research was conducted to inform the makeup of the proposed pavement cross-sections.  Additionally, a project sign to be utilized on Roadway Capital Improvement Projects is also being proposed as a standard to be included on all Roadway Capital Improvement Projects (P-12).

 

In accordance with the procedures set forth in the Subdivision Control Ordinance, the Department of Engineering Services is requesting approval of the revised standards as proposed from the Planning and Zoning Commission.  If approved by the City Council, the documents will be filed with the Office of the City Secretary and anticipated to become effective February 5, 2024.

 

Recommendation

The Department of Engineering Services recommends approval of the revised City of Mansfield Standard Construction Details (January 2024).

 

Attachments

Standard Construction Details (January 2024)