File #: 13-0677    Version: 1 Name: Resolution - A Resolution Supporting the Texas Department of Transportation (TxDOT) and the North Texas Tollway Authority (NTTA) and their Plan to Construct Tolled Main lanes and Continuous Frontage Roads on SH 360 from E. Sublett/W. Camp Wisdom Road to U
Type: Resolution Status: Passed
File created: 9/11/2013 In control: City Council
On agenda: 9/23/2013 Final action: 9/23/2013
Title: Resolution - A Resolution Supporting the Texas Department of Transportation (TxDOT) and the North Texas Tollway Authority (NTTA) and their Plan to Construct Tolled Main lanes and Continuous Frontage Roads on SH 360 from E. Sublett/W. Camp Wisdom Road to US 287
Sponsors: Steve Freeman
Attachments: 1. Public Hearing Notice, 2. Resolution
Title
Resolution - A Resolution Supporting the Texas Department of Transportation (TxDOT) and the North Texas Tollway Authority (NTTA) and their Plan to Construct Tolled Main lanes and Continuous Frontage Roads on SH 360 from E. Sublett/W. Camp Wisdom Road to US 287
 
Requested Action
Approve the resolution supporting the plan to construct tolled main lanes and continuous frontage roads on SH 360 from E. Sublett/W. Camp Wisdom Road to US 287
 
Recommendation
The Engineering Staff recommends the approval of the support resolution for constructing SH 360.
 
Description/History
NTTA began the Environmental Assessment (EA) process for SH 360 in late 2009.  Since that time environmental impacts have been evaluated that include:  traffic, natural resources, cultural resources, air quality, noise and other environmental considerations.  In addition to evaluating the environmental impacts a roadway schematic was prepared for environmental clearance.   
 
The EA was issued a Satisfactory for Further Progress (SFP) finding by the Federal Highway Administration (FHWA) in August 2013.  This finding allows the project to move forward to obtain a Finding of No Significant Impact (FONSI), which will allow the project to move to the design and construction phase.  In addition to the SFP, the FHWA approved the roadway design schematic in early September 2013.  A public Hearing to present the findings of the EA, review the schematic and receive comments is scheduled for Thursday October 17, 2013 from 6 to 8 pm at Timberview High School.  The notification letter is attached.
 
TxDOT will be responsible for the design and construction of SH 360 and NTTA will operate roadway.   The project will be design/build and will be phased.  The first phase will include the construction of 2 toll lanes in each direction from Sublett/Camp Wisdom Road to E.  Broad Street and from E. Broad Street to US 287 there will be one toll lane in each direction.  Frontage roads and sidewalks will be constructed along the entire length of the project with this phase.  Pending funding, TxDOT is anticipating awarding the project near the end of 2014 with construction complete mid 2018.
 
Justification
Prior to the public hearing TxDOT has requested a resolution of support from the SH 360 adjacent cities of Grand Prairie, Arlington and Mansfield.  These support resolutions will be beneficial in obtaining the FONSI.
 
The Public Works Director will be in attendance at the meeting to answer Council's questions regarding the proposed contract.  A resolution is attached for Council's consideration.
 
Funding Source
N/A
Additionl Info. (attachments)
Public Hearing Notice
Resolution
 
Prepared By
David Boski, P.E., Transportation Engineer, Public Works Department
817-276-4208