File #: 24-6237    Version: Name: Resolution – A Resolution Awarding Contracts for the Construction of Matlock Road Left Turn Lane Improvements Including Capko Concrete Structures, LLC. for Construction, Brittain and Crawford, LLC for Surveying, and Raba Kistner, Inc. for Material Testing
Type: Resolution Status: Passed
File created: 10/6/2024 In control: City Council
On agenda: 10/14/2024 Final action: 10/14/2024
Title: Resolution - A Resolution Awarding Contracts for the Construction of Matlock Road Left Turn Lane Improvements Including Capko Concrete Structures, LLC. for Construction, Brittain and Crawford, LLC for Surveying, and Raba Kistner, Inc. for Material Testing and Authorizing Funding for an Amount Not to Exceed $275,129.86; Finding That the Meeting at Which This Is Approved Is Open to the Public as Required by Law; and Declaring an Effective Date (Street Bond Fund)
Attachments: 1. Resolution, 2. Exhibit A, 3. Exhibit B, 4. Exhibit C
Title
Resolution - A Resolution Awarding Contracts for the Construction of Matlock Road Left Turn Lane Improvements Including Capko Concrete Structures, LLC. for Construction, Brittain and Crawford, LLC for Surveying, and Raba Kistner, Inc. for Material Testing and Authorizing Funding for an Amount Not to Exceed $275,129.86; Finding That the Meeting at Which This Is Approved Is Open to the Public as Required by Law; and Declaring an Effective Date (Street Bond Fund)

Requested Action
Consider the Resolution awarding contracts for the construction of Construction of Matlock Road Left Turn Lane Improvements Including Capko Concrete Structures, LLC.for Construction, Brittain and Crawford, LLC for Surveying, and Raba Kistner, Inc. for Material Testing and Authorizing Funding for an Amount Not to Exceed $275,129.86.

Recommendation
The Engineering Staff recommends approval of the Resolution.

Description/History
This project includes construction of the extension of the southbound left turn lane at Matlock Rd. & Cannon Dr. and the northbound turn lane at Matlock Rd. and Country Club Dr. These improvements will provide additional storage and minimize traffic backing up into the through lanes during peak hour traffic.

The project was bid on September 11, 2024, and there were four bidders for the project. Bids ranged from a low bid of $134,940.00 to a high bid of $305,016.00. The lowest bidder was disqualified as they submitted an incomplete bid. The next lowest bidder is Capko Concrete Structures, LLC. with a bid of $225,208.30. See attached bid tabulation.

The contract time for this project will be sixty (60) working days or approximately 3 months. The limits for this project are the intersections of Matlock Road and Country Club Drive, and Matlock Road and Cannon Drive.

The requested funds are for a construction contract in the amount of $247,729.13, which includes a 10% construction contingency, $11,000 for survey services which includes a 10% contingen...