File #: 23-5675    Version: 1 Name: Seeton Road Hike and Bike Trail Schematic
Type: Resolution Status: Passed
File created: 10/13/2023 In control: City Council
On agenda: 10/23/2023 Final action: 10/23/2023
Title: Resolution - A Resolution of the City Council of the City of Mansfield, Texas, Approving a Professional Services Contract Between the City of Mansfield, TX and Freese and Nichols, Inc. in an Amount Not to Exceed $180,000.00, and Brittain and Crawford, LLC. in an Amount Not to Exceed $64,800.00 for the Design and Survey, respectively, of East Seeton Road and Bridge Hike and Bike Trail Study (Street Bond Fund)
Sponsors: Raymond Coffman
Attachments: 1. Resolution, 2. Exhibit A - Contract (F&N), 3. Exhibit B - Contract (B&C), 4. Exhibit C - Schedule, 5. Exhibit D - Location Map
Title
Resolution - A Resolution of the City Council of the City of Mansfield, Texas, Approving a Professional Services Contract Between the City of Mansfield, TX and Freese and Nichols, Inc. in an Amount Not to Exceed $180,000.00, and Brittain and Crawford, LLC. in an Amount Not to Exceed $64,800.00 for the Design and Survey, respectively, of East Seeton Road and Bridge Hike and Bike Trail Study (Street Bond Fund)

Requested Action
Consider the authorization of funding and approval of the contract.

Recommendation
Approval of a professional services contract between the City of Mansfield, TX and Freese and Nichols, Inc. in an amount not to exceed $180,000.00, and Brittain and Crawford, LLC. in an amount not to exceed $64,800.00 for the design and survey, respectively, of East Seeton Road and Bridge Hike and Bike Trail Study.

Description/History
This project is for the development of the Seeton Road and Bridge Hike and Bike Trail design schematics and permitting. This project design is part of the 2022 Roadway Capital Improvement Plan. This portion of East Seeton Road provides a link to and from neighborhoods and schools north and south of the Joe Pool Lake bridge. Currently, there are no pedestrian facilities that link these two areas and the existing bridge across Joe Pool Lake does not provide for the width needed for a sidewalk to be incorporated into the structure. Day Miar Rd. is currently being reconstructed north of Lake Ridge High School. A hike and bike trail south of Lake Ridge High School will provide a critical pedestrian connection to the existing sidewalk along National Pkwy.

This study will evaluate three alternatives for the road and bridge hike and bike trail crossing property owned by the US Army Corps of Engineers (USACE). This process will require developing and coordinating alternatives that are acceptable to USACE and culminating in a letter of support for the project which can be used to request state or federal construction fu...

Click here for full text