Title
Resolution - A Resolution to Award a Construction Contract for the Debbie Lane Paving, Drainage and Signal Improvements to JLB Contracting, LLC and Authorization of Funding for an Amount not to Exceed $753,189.13 (Street Bond Fund)
Requested Action
Approve the resolution to award the construction contract for the Debbie Lane Paving, Drainage and Signal Improvements to JLB Contracting, LLC.
Recommendation
The Engineering Staff recommends the approval of the construction contract award to JLB Contracting, LLC for the Debbie Lane paving, drainage and signal improvements and the authorization of funding.
Description/History
The Debbie Lane improvements consist of installing a raised center median with landscaping on Debbie Lane between FM 157 and US Hwy 287, installing dual left turns in the east and westbound directions on Debbie Lane at the FM 157 intersection and adding a dedicated right turn lane in the eastbound direction at the Debbie Lane/FM 157 intersection. These intersection improvements will include traffic signal modifications. In addition the existing asphalt within the project boundaries will be milled and overlaid with new asphalt pavement and striping.
The engineer’s probable opinion of cost for this project was $739,000.00. The project was bid on May 17, 2012 and there were three bidders for the project. Bids ranged from a low bid of $717,322.98 to a high bid of $893,315.00. The low bidder was JLB Contacting LLC. The bid did contain 2 alternate bid items to wedge mill the asphalt from roadway. This process removes less material then a full asphalt mill. Staff’s opinion is that the slight cost savings from the alternated bid items ($23,749.60) does not justify using the wedge mill method.
The contract time for this project is Ninety (90) working days or approximately 4 months. Bid tabulation is attached for Council’s review.
Per an Interlocal Agreement with MISD, the school district will contribute 25% of cost for the constructi...