File #: 18-2976    Version: 1 Name: Resolution - A Resolution Authorizing a Contract with Freese & Nichols INC. for Engineering Services Related to the Rehabilitation of the S. H. 360 Wastewater Lift Station for an amount not to exceed $181,206 (Utility Operations Fund)
Type: Resolution Status: Passed
File created: 11/26/2018 In control: City Council
On agenda: 11/26/2018 Final action: 11/26/2018
Title: Resolution - A Resolution Authorizing a Contract with Freese & Nichols INC. for Engineering Services Related to the Rehabilitation of the S. H. 360 Wastewater Lift Station for an amount not to exceed $181,206 (Utility Operations Fund)
Sponsors: Joe Smolinski, Alex Whiteway
Attachments: 1. Resolution

Title

Resolution - A Resolution Authorizing a Contract with Freese & Nichols INC. for Engineering Services Related to the Rehabilitation of the S. H. 360 Wastewater Lift Station for an amount not to exceed $181,206 (Utility Operations Fund)

Requested Action

Consider the authorization of funds in the amount of one hundred eighty-one thousand two hundred six dollars and zero cents ($181,206.00) and approval of a contract with Freese & Nichols, Inc. for the Engineering Services related to Rehabilitation of the S.H. 360 Wastewater Lift Station.

Recommendation

Staff recommends adopting the resolution.

Description/History

Freese and Nichols, Inc. (FNI) was selected by the City of Mansfield (City) to provide professional services for the S.H. 360 Wastewater Lift Station (360 Lift Station) Rehabilitation project. The project includes design, bid, and construction phase services for the rehabilitation of the existing S.H. 360 Lift Station, including pump replacements, yard piping, electrical upgrades, wet well coating, and various other miscellaneous site improvements.

Justification

The 360 Wastewater Lift Station was placed into service in 2001 to serve the Lowes Farm Development.  In 2005 the Bankston Meadows Development was constructed, and the effluent wastewater for this development was routed into the 360 Lift Station.  Current conditions have reached the maximum designed capacity of the 360 Lift Station. We have had operational difficulties maintaining this lift station under its current condition. This contract will determine the overall condition and necessary improvements needed to remain in compliance with all state and federal regulations. This project was identified in the FY 2019 Utility CIP. 

Funding Source

Utility Operations Fund

Prepared By

Alex Whiteway., Assistant Director, Utilities Department

817-728-3615