Title: Resolution - A Resolution Awarding Contracts for the Construction of East Broad Street Improvements (US 287 to Cannon Dr.) to JLB Contracting, LLC., for Construction, to Britain and Crawford, LLC., for Surveying and to Fugro Consultants, Inc, for Material Testing and Authorizing Funding for an Amount Not to Exceed $6,433,438.45 (MEDC, Street Bond Fund and Utility Bond Fund)
Sponsors: Joe Smolinski, Bart VanAmburgh
Attachments: 1. Resolution, 2. Bid Tabs, 3. East Broad Street Map
Title
Resolution - A Resolution Awarding Contracts for the Construction of East Broad Street Improvements (US 287 to Cannon Dr.) to JLB Contracting, LLC., for Construction, to Britain and Crawford, LLC., for Surveying and to Fugro Consultants, Inc, for Material Testing and Authorizing Funding for an Amount Not to Exceed $6,433,438.45 (MEDC, Street Bond Fund and Utility Bond Fund)

Requested Action
Consider the Resolution awarding a contract for the construction of East Broad Street Improvements to JLB Contracting, LLC., for construction, to Britain and Crawford LLC., for surveying and to Fugro Consultants, Inc, for material testing and authorizing funding for an amount not to exceed $6,433,438.45.

Recommendation
The Engineering Staff recommends approval of the Resolution.

Description/History
The MEDC approved contribution for both East Broad Street and Regency Parkway is $5,000,000. The remainder of the East Broad St. construction will be funded by the Street Bond Fund.

The project was bid on September 26, 2017 and there were six bidders for the project. The lowest qualified bidder was JLB Contracting, LLC. Bids ranged from a low bid of $5,891,369.95 to a high bid of $8,827,967.00.

The contract time for this project is two hundred (200) working days or approximately 10 months with a substantial completion date of August 15, 2018. The limits for this project are from US 287 to Cannon Dr.

This project includes constructing a six lane divided roadway, drainage, minor water and sewer improvements and driveway and turn lanes along the northbound frontage road north of East Broad St. for the Shops of Broad Retail Development.

The requested funds are for a construction contract in the amount of $5,891,369.95, a 5% construction contingency, $120,000.00 for material testing which includes a 20% contingency and $150,000.00 for survey services which includes a 20% contingency and other miscellaneous services needed to complete the construction of the project...