File #: 18-2900    Version: 1 Name: Review and Consideration of Detailed Site Plans for Southpointe Phase 4, 5, 7, 8A and 8B on Approximately 206.54 Acres, Phase 8B Generally Located at the Southwest Corner of the Intersection of Matlock Road and the Union Pacific Railroad and Approximately
Type: Consideration Item Status: Passed
File created: 9/17/2018 In control: City Council
On agenda: 9/24/2018 Final action: 9/24/2018
Title: Review and Consideration of Detailed Site Plans for Southpointe Phase 4, 5, 7, 8A and 8B on Approximately 206.54 Acres, Phase 8B Generally Located at the Southwest Corner of the Intersection of Matlock Road and the Union Pacific Railroad and Approximately 650 Feet West of S.H. 360; and Phases 4, 5, 7 and 8A Generally Located East of U.S. 287, West of S. Matlock Road, Approximately 400 Feet South of Lone Star Road, and Approximately 1,100 Feet North of the Intersection of S. Matlock Road and S.H. 360; Ruby-07-SPMTGE, LLC (DS#18-004 through DS#18-008)
Sponsors: Joe Smolinski, Lisa Sudbury
Attachments: 1. Southpointe location map, 2. Letter of Request, 3. SP Detailed Site Plans
Title
Review and Consideration of Detailed Site Plans for Southpointe Phase 4, 5, 7, 8A and 8B on Approximately 206.54 Acres, Phase 8B Generally Located at the Southwest Corner of the Intersection of Matlock Road and the Union Pacific Railroad and Approximately 650 Feet West of S.H. 360; and Phases 4, 5, 7 and 8A Generally Located East of U.S. 287, West of S. Matlock Road, Approximately 400 Feet South of Lone Star Road, and Approximately 1,100 Feet North of the Intersection of S. Matlock Road and S.H. 360; Ruby-07-SPMTGE, LLC (DS#18-004 through DS#18-008)

Requested Action
To consider the subject request.

Recommendation
The Planning and Zoning Commission reviewed the Detailed Site Plans on September 17, 2017, and voted 5 to 0 to recommend approval with the requested modifications. Commissioners Hudson and Smithee were absent.

Description/History
The developer of Southpointe has submitted Detailed Site Plans for Phases 4, 5, 7, 8A and 8B. These site plans are interlocking with street and open space connections to each other and are being reviewed together under an overall Master Plan.
Between the five phases, there will be a total of 691 residential lots. As required by the Southpointe PD, each phase has three different residential products: Cottage, Village and Manor lots. The overall percentage of each lot type complies with the Southpointe requirements.
Jointly, these phases have approximately 28.18 acres of open space, including a central pocket park in each phase that will accommodate the required amenities listed on the Landscape Plan. The design features for entryways, screening walls, street trees, sidewalks, trails and other amenities will be similar to those under construction in Phases 1, 2, 3 and 6A.
Because of geographic issues related to drill sites, school properties, drainage facilities, pipelines and other limitations, the applicant is requesting minor modifications of the Southpointe PD Development Standards related to the orient...

Click here for full text