Title
Resolution - A Resolution Authorizing a Contract for Rehabilitation of the 300,000 Gallon Cardinal Oaks Ground Storage Tank to N.G. Painting, L.P. for an Amount not to Exceed ($195,800.00)
Requested Action
Consider the resolution authorizing funds for an amount not to exceed One Hundred Ninety-Five Thousand Eight Hundred Dollars ($195,800.00) and approval of a contract with N.G. Painting L.P. for the replacement of the rehabilitation of the 300,000 Gallon Cardinal Oaks Pumps Station.
Recommendation
Staff recommends approval
Description/History
Cardinal Oaks Pump Station is a 300,000-gallon ground storage tank constructed in 1986. The pump station stores water to disburse it later to keep up with peak demand.
Justification
Cardinal Oaks Pump Station requires a new coating system to protect the integrity of the tank. The tank’s current coating system has several failures that has created corrosion spots on the metal construction of the tank. These failures will eventually corrode through the metal properties of the tank and develop leaks. This project consists of installing a new coating system and replacing some instrumentation.
Funding Source
Utility Operations Fund
Prepared By
Alex Whiteway., Assistant Director, Utilities Department