Title
Resolution - A Resolution Awarding a Contract for the Construction of the FM 157 & South Parkridge Utility Improvements to Woody Contractors, Inc. and Authorizing Funding for an Amount Not to Exceed $1,548,279.05 (Utility Fund)

Requested Action
Consider the Resolution awarding contract for the construction of FM 157 & South Parkridge Utility Improvements to Woody Contractors, Inc. and authorizing funding for an amount not to exceed $1,548,279.05.

Recommendation
The Engineering Staff recommends approval of the Resolution.

Description/History
The project consists of three individual sewer line improvements at locations described below.

• Along FM 157 from Moore Rd. to Tanglewood Drive - upsize the existing sanitary sewer line from an 8-inch to a 12-inch line. A new method of trenchless installation is being pursued due to the extensive underground franchise utilities and working in TxDOT right-of-way. This is Project Number 1 in the 2019 Water & Wastewater Master Plan and is identified in the Utility Capital Improvement Plan.

• South side of Debbie Lane near the Bent Trail intersection - a 12-inch interconnection between the existing 12-inch and 24-inch parallel sewer interceptors. This is Project Number 1 identified in the 2019 Water & Wastewater Master Plan and is identified in the Utility Capital Improvement Plan.

• S. Parkridge Drive - Replacement and upsizing of 1,300 linear feet of 6-inch sanitary sewer line to an 8-inch line due to a history of line blockage, and replacement of the existing AC water line to PVC. Because the pavement will need to be open-cut to replace the sewer line, the asphalt pavement will be replaced via full-depth pavement reclamation. This project is identified in the Utility Capital Improvement Plan.


The project was bid on June 9, 2022, and there were three bidders for the project. The lowest and best bidder is Woody Contractors, Inc. The bid tabulation is attached. Bids ranged from a low bid of $1,367,542.90 to a...